O soprema 3 repair and re cover roofing guide table of contents 1 0 evaluation of the condition of the roofing system 4 1 1 visual inspection 4 1 2 thermographic or hygrometric analysis 5 1 3 types of defects 5 2 0 reconstruction of sbs modified bitumen membranes 6 2 1 granule loss 6 2 1 1 membrane regranulation with liquid coatings and bulk granules 6.
Soprema sbs roofing manual.
Place soprafix base 611 in desired position.
Elastophene fr gr is then rolled into the cold adhesive or hot asphalt and subsequently rolled with a weighted roller.
Sopra iso plus colgrip a mineral fibre rock wool insulation boards 3 3 1.
Refer to the soprema sbs roofing manual for additional application guidelines.
Refer to the soprema sbs roofing manual for additional application guidelines.
Apply approved cold adhesive or hot asphalt following manufacturer specifications.
Soprafix base 611 is mechanically fastened through the laps following the details for the uplift pressure required.
Place elastophene fr gr in desired position and back roll the product.
Refer to the soprema sbs roofing manual for additional application guidelines.
Soprawalk is then rolled into the cold adhesive or hot asphalt and subsequently rolled with a weighted roller.
Roofing materials recovery insulation boards and accessories installation of recovery insulation boards mechanically fastened or adhered with adhesive polyisocyanurate insulation board sopra iso 3 2 1.
Sopralene 250 sp 4 0 is an sbs modified bitumen base ply for use in approved multi ply membrane and flashing assemblies.
Subsequent approved inter ply or cap ply membranes are applied to soprafix base 611 via heat welding.
Refer to soprema sbs roofing manual for additional application guidelines.
Sopralene 250 sp 4 0 is composed of a proprietary formulation of elastomeric styrene butadiene styrene sbs polymer modified bitumen and is reinforced with a tough dimensionally stable non woven polyester mat.
Soprema continues investment in next generation with scholarship program 11 19 2019 media multiple 5 000 awards to support students studying architecture engineering other building envelope fields wadsworth ohio nov.
Elastophene flam ls fr gr is then heat welded to approved substrates.
Soprema vice president and general manager tim kersey will speak with rooferscoffeeshop partner heidi j.
Prior to installation unroll elastophene flam ls fr gr onto the roof surface and allow to relax.
Ellsworth in a special webinar living roof protects veterans stories the museum and memorial is truly an architectural work of art that honors and remembers all veterans.
Sopra iso colgrip b 3 2 2.
15 2019 industry advancement.